Construction Quotation

JONSON CIVIL CONSTRUCTION

Quotation Overview

Quotation No.: JCC/2026/____ Date: 10 November 2026 Client Name: Mr. Yamanappa Rathbappa Project Location: Nirman Layout, Koppa Road, Nirman Layout, Koppa, Bengaluru, Karnataka – 560105. Site Dimensions: 20 × 40 Feet (800 Sqft) Site Facing: North Facing Building Structure: G + 2 (Ground + Two Floors)

Construction Cost Details

Total Construction Area

2,400 Sqft

Rate per Sqft

₹2,200

Construction Type

With Materials

Total Construction Cost

₹52,80,000/-

Rupees Fifty-Two Lakhs Eighty Thousand Only.

Material Specifications & Scope of Work

  1. 1A. Structural & Civil Works1. Cement – Dalmia or equivalent brand. 2. Steel – Kamadhenu, Meenakshi or equivalent. 3. Hollow block construction. 4. RCC concrete slab construction. 5. Complete civil construction for G+2 building.
  2. 2B. Water Storage1. Underground sump – 6,000 litres. 2. Overhead water tank – 2,000 litres.
  3. 3C. Doors, Windows & Railings1. Main door frame and shutter – Teak wood for owner's house. 2. Other door frames and shutters – Sal wood. 3. MS railings. 4. SS railings with glass for front elevation. 5. UPVC windows with MS railings.
  4. 4D. Flooring & Bathroom1. Floor tiles – ₹50 per Sqft, any colour of choice. 2. Bathroom sanitary and fittings – Hindware or equivalent brand. 3. Staircase – Sadarahalli white marble stone.
  5. 5E. Kitchen & Interior Works1. Kitchen cabinets. 2. 20mm marble slab countertop. 3. Kitchen sink – Hindware or equivalent. 4. Full-furnished concrete slab work. 5. False ceiling work.
  6. 6F. Electrical Works1. Electrical wiring – Anchor or Polycab. 2. Standard electrical installation and accessories.
  7. 7G. Painting & Elevation1. Exterior elevation texture painting. 2. Interior standard-quality painting. 3. Two-coat colour finishing. 4. Modern elevation design exclusively for the owner's house.

General Terms & Conditions

  1. 11. Materials will be selected from the above-mentioned brands or equivalent quality.
  2. 22. Any changes or additional works beyond the agreed specifications will be discussed and charged separately with the client's approval.
  3. 33. Construction work will be carried out as per the approved building plan and agreed specifications.
  4. 44. Payment stages and schedule will be mutually agreed upon before commencement of work.